Project Details
Status | Active |
---|---|
Effective start/end date | 9/1/24 → 5/31/26 |
Funding
- Bioindustrial Manufacturing and Design Ecosystem, Inc (T-ADP28-A-0055 // FA8650-21-2-5028)
- Air Force Materiel Command (T-ADP28-A-0055 // FA8650-21-2-5028)
Project: Research project
Status | Active |
---|---|
Effective start/end date | 9/1/24 → 5/31/26 |