Optimizing Bridge Abutment Slope Protection at Stream Crossing

Project: Research project

Project Details

Description

The following specific objectives are defined based on the request for proposal (RFP) by WHRP:
 Determine the severity, causes, and types of slope protection issues in Wisconsin by analyzing
qualitative and quantitative factors believed to trigger failure in the slope protection.
 Plan and oversee comprehensive surveys providing useful information about alternative slope
protection strategies practiced successfully at various other states.
 Perform Life-Cycle cost analyses to provide information about the optimum abutment slope protection
strategy with maximum service life and minimum life-cycle cost.
 Update the WisDOT bridge manual with consistent recommendations and guidelines from this study.
StatusActive
Effective start/end date10/1/204/1/22

Funding

  • Wisconsin Department of Transportation (0092-21-02)
  • Federal Highway Administration (0092-21-02)

Fingerprint