Abstract
The CLIC Test Facility 3 (CTF3) is being built and commissioned by an international collaboration in order to test the feasibility of the proposed Compact Linear Collider (CLIC) two-beam acceleration scheme. The monitoring and control of the bunch length throughout the CTF3 complex is important since this affects the efficiency and the stability of the final RF power production process. Bunch length diagnostics therefore form an essential component of the beam instrumentation at CTF3. This paper presents longitudinal profile measurements based on Streak camera and non-destructive RF power and microwave spectrometry techniques.
Original language | English (US) |
---|---|
Title of host publication | Proceedings - 25th Linear Accelerator Conference, LINAC 2010 |
Pages | 647-649 |
Number of pages | 3 |
State | Published - Dec 1 2011 |
Event | 25th International Linear Accelerator Conference, LINAC 2010 - Tsukuba, Ibaraki, Japan Duration: Sep 12 2010 → Sep 17 2010 |
Other
Other | 25th International Linear Accelerator Conference, LINAC 2010 |
---|---|
Country/Territory | Japan |
City | Tsukuba, Ibaraki |
Period | 9/12/10 → 9/17/10 |
ASJC Scopus subject areas
- Atomic and Molecular Physics, and Optics