Testing of railroad signal equipment for power line interference suceptibility part II: Test results

Allen Taflove

Research output: Contribution to journalArticlepeer-review

Abstract

A basic need to permit planning of new ac power lines near railroad systems is accurate data for the levels of ac interference that upset the operation of railroad signal components or systems. Such data would help the power system and railroad system design engineer understand the magnitude of the interference problem, investigate alternative mitigation approaches, and select one that is cost-effective and mutually agreeable. Under EPRI research program RP 1902-1, IITRI developed a body of key railroad signal equipment susceptibility data in cooperation with the major U.S. manufacturers of this equipment. This paper describes the results of the susceptibility tests for track and line relays, electronic track circuits, and grade-crossing warning devices. A companion paper (Part I) describes the innovative test jig developed under RP 1902-1 which was used to perform the tests.

Original languageEnglish (US)
Pages (from-to)3352-3359
Number of pages8
JournalIEEE Transactions on Power Apparatus and Systems
VolumePAS-104
Issue number12
DOIs
StatePublished - Dec 1985

ASJC Scopus subject areas

  • Energy Engineering and Power Technology
  • Engineering(all)
  • Electrical and Electronic Engineering

Fingerprint

Dive into the research topics of 'Testing of railroad signal equipment for power line interference suceptibility part II: Test results'. Together they form a unique fingerprint.

Cite this