Abstract
This paper presents a control theoretic dynamic model for optimizing the timing and intensity of major highway pavement maintenance actions. The solution procedure is demonstrated through a simple case study, and the worthiness as a problem-solving tool is discussed through a systematic evaluation of the solutions.
Original language | English (US) |
---|---|
Pages (from-to) | 151-166 |
Number of pages | 16 |
Journal | Transportation Research Part A |
Volume | 28 |
Issue number | 2 |
DOIs | |
State | Published - Mar 1994 |
ASJC Scopus subject areas
- Civil and Structural Engineering
- Business, Management and Accounting (miscellaneous)
- Transportation
- Aerospace Engineering
- Management Science and Operations Research